Driveway Paving in Greater Boston, Massachusetts

About this service

A driveway is the piece of your property you drive over every single day, and it is the first thing anyone sees from the street. We build new asphalt driveways across Greater Boston the way they are supposed to be built: excavate to grade, compact a stone base, then lay binder and top course while the mix is still hot enough to knit together.

You get a written scope before we start, one crew from the first cut to the last pass of the roller, and a one-year workmanship warranty on the finished surface.

Freshly paved residential asphalt driveway with clean edges beside a lawn

Timing

How long it takes, and when you get your surface back

This is the question we get more than any other, so here it is up front instead of buried in a phone call.

  • On site 1 to 2 days Excavation and base on day one, paving on day two. Small driveways finish in a single day.
  • Walk on it 24 hours Soft shoes only. Keep bikes, kickstands and ladders off the surface.
  • Park on it 3 days Longer in a July heat wave. We give you the date before we leave.

What you are seeing

Signs this is the service you need

Asphalt fails in a predictable order. Any one of these is enough to call.

  • Alligator cracking

    A web of connected cracks means the base underneath is moving. Paving over it hides the problem for one winter, then it comes right back.

  • Standing water

    Puddles that sit for more than a day are a pitch problem. Water that cannot leave the surface goes into it, then freezes and lifts.

  • Crumbling edges

    Asphalt with no shoulder support ravels from the outside in. A new driveway needs the edges backed and compacted.

  • Patch on patch

    When repairs cover more surface than original pavement, another patch is money spent on a driveway that is already finished.

What's included

Everything in the scope

  • Excavation to grade and haul-off of the old surface
  • Processed gravel base, graded and compacted in lifts
  • Binder course laid and rolled for structure
  • Top course laid hot for the finished surface
  • Pitch set so water runs off the driveway, not toward the house
  • Edges backed and compacted, aprons tied into the street

Why us for this

Three things worth knowing

  • Two lifts, not one

    Binder carries the load and top course takes the wear. A single thin lift looks the same on day one and fails years earlier.

  • The base gets the time

    Most driveway failures in New England start under the asphalt. We compact the base properly because that is the part you cannot fix later.

  • One crew, start to finish

    The people who quote the job are the people who run the roller. Nothing is handed off to a sub you never met.

Send a photo. We will tell you what it needs.

Free written estimate, and 10% off your first paving or sealcoating job.

How it works

From your call to the finished surface

  1. 01

    We measure on site

    We walk the driveway with you, measure it, check how water moves and tell you what the surface actually needs.

  2. 02

    You get it in writing

    Scope, thickness, base depth and the schedule, written down before anyone starts.

  3. 03

    We build it

    Excavate, base, compact, pave, roll. Most driveways are one or two days on site.

  4. 04

    We hand it back with dates

    You leave knowing the day you can walk on it and the day you can park on it.

Around here

Why New England eats driveways

The freeze-thaw cycle here runs dozens of times a winter. Water gets into a hairline crack, freezes overnight, expands, and opens the crack a little wider every time. Add road salt and plow blades and a thin driveway laid on a weak base has no chance. That is why we spend the time on the base and the pitch, and why we build with two lifts instead of one.

Alligator cracking across an asphalt surface
Cracks in a web mean the base below has started to move.

Questions

Driveway Paving, answered

  • How long before I can park on my new driveway?

    Three days is our standard answer, and it is the honest one for Massachusetts. New asphalt is soft while it cools and cures. You can walk on it after 24 hours. We give you the exact date before we leave the site.

  • Can I pave over my old driveway instead?

    Sometimes. If the base is solid and the cracks are narrow, an overlay is the smarter spend. If the cracks are connected in a web, the base is the problem and an overlay just buys a winter. We tell you which one you have when we measure.

  • How thick should a residential driveway be?

    We build most homes on a compacted gravel base with a binder course and a top course over it. Exact depth depends on your soil and whether trucks will use it. We put the numbers in the written estimate so you can compare them to any other quote.

  • Will you damage my lawn or my apron?

    Heavy equipment leaves marks. We keep the machines on the work area, back the edges when we finish, and tie the apron into the street cleanly. Anything we expect to disturb, we tell you about before we start.

  • When can I seal a new driveway?

    Not right away. New asphalt needs six to twelve months to cure before the first sealcoat. Anyone offering to seal fresh pavement is selling you something that will not bond.

  • Do you pave driveways in my town?

    We work across Greater Boston and out to about an hour of driving, which covers Newton, Waltham, Lynn, Peabody, Quincy, Framingham and the towns around them. Call or text and we will tell you straight away if you are in range.

Free estimate

Send us the surface. We will come measure it.

Tell us what you have and we will schedule a visit to measure it and put a written number in your hands. Nothing is quoted before we see the surface, because square footage and the state of the base are what decide the job.

  • We measure on site, then write the scope down
  • One-year workmanship warranty on completed work